Oklahoma Farm Report masthead graphic with wheat on the left and cattle on the right.
Howdy Neighbors!
Ron Hays, Director of Farm and Ranch Programming, Radio Oklahoma Ag Network  |  2401 Exchange Ave, Suite F, Oklahoma City, Ok 73108  |  (405) 601-9211

advertisements
   
   
   
   
   
   

Agricultural News


Build a Pond Once, The Right Way

Fri, 10 Oct 2014 09:58:22 CDT

Build a Pond Once, The Right Way

If it is worth doing, it is worth doing right. This old adage rings true for pond construction as much as anything.


"You only get one chance to build a pond the right way," said Marley Beem, Oklahoma State University Cooperative Extension aquaculture specialist. "There are many, many ways in which a pond can be built wrong. None of which you will want to experience."


Many of these avoidable pond construction errors involve the dam. While it is cheaper to build the dam with steeper banks, pond owners are left with a short-lived pond with a weak and narrow dam.


"A dam with a broader base and gentler slopes will be stronger, less prone to erosion, less vulnerable to burrowing damage and easier to mow twice yearly to eliminate damaging trees and shrubs before they get established," Beem said.


Before dam construction, remove topsoil and dig a core trench along the midline of the dam.


"A trench needs to be dug along the midline and packed with your best clay soil before the dam is built. Skip this step and you risk water seeping under the dam," he said. "The soils in the dam can be properly compacted by laying it down in layers, checking for adequate moisture and using special compaction equipment on each layer, like a sheepsfoot roller."


Only soils with adequate water-holding capacity should be used. Also, there needs to be enough watershed to fill the pond.


"It takes a large runoff area to supply water to a pond, especially during a drought period," Beem said.


The Natural Resource Conservation Service (NRCS) offers expert, onsite advice for design and construction assistance.


"By all means pick an experienced earthwork contractor," said Beem. "But in addition, use the design assistance of the NRCS, and be onsite as often as possible to ensure NRCS recommendations are followed."


   

 

WebReadyTM Powered by WireReady® NSI

 


Top Agricultural News

  • NCBA Urges EPA to Press Pause on New WOTUS Rulemaking  Thu, 06 Oct 2022 10:32:07 CDT
  • Beef Industry Scholarship Applications Are Now Available for Undergraduate Students  Thu, 06 Oct 2022 10:05:07 CDT
  • Oklahoma Drought Levels Rise in All Categories This Week, But Chance of Rain In Forecast   Thu, 06 Oct 2022 09:43:41 CDT
  • Market Update with Paul Dykstra-Texas Grade Tumbles   Thu, 06 Oct 2022 09:21:23 CDT
  • Best Chance for Rain Shows up in Western Oklahoma and Panhandle Over the Next Week   Thu, 06 Oct 2022 09:03:52 CDT
  • Triangle H Named CAB Feedyard Commitment to Excellence Honoree   Thu, 06 Oct 2022 08:46:38 CDT
  • Top Winners of the 2022 Tulsa State Fair Market Animal Show Awarded Over $400,000   Thu, 06 Oct 2022 08:43:20 CDT
  • Next Generation Leaders Discuss Solutions to Food Waste  Thu, 06 Oct 2022 08:42:16 CDT

  • More Headlines...

       

    Ron salutes our daily email sponsors!

    Oklahoma Beef council Oklahoma Ag Credit Oklahoma Farm Bureau National Livestock Credit Ag Mediation Program P&K Equipment Oklahoma City Farm Show Union Mutual Stillwater Milling Oklahoma Cattlemen's Association KIS FUTURES, INC.
       

       

    Search OklahomaFarmReport.com

    © 2008-2022 Oklahoma Farm Report
    Email Ron   |   Newsletter Signup   |    Current Spots   |    Program Links

    WebReady powered by WireReady® Inc.