Oklahoma Farm Report masthead graphic with wheat on the left and cattle on the right.
Howdy Neighbors!
Ron Hays, Director of Farm and Ranch Programming, Radio Oklahoma Ag Network  |  2401 Exchange Ave, Suite F, Oklahoma City, Ok 73108  |  (405) 601-9211

advertisements
   
   
   
   
   

Agricultural News


Build a Pond Once, The Right Way

Fri, 10 Oct 2014 09:58:22 CDT

Build a Pond Once, The Right Way

If it is worth doing, it is worth doing right. This old adage rings true for pond construction as much as anything.


"You only get one chance to build a pond the right way," said Marley Beem, Oklahoma State University Cooperative Extension aquaculture specialist. "There are many, many ways in which a pond can be built wrong. None of which you will want to experience."


Many of these avoidable pond construction errors involve the dam. While it is cheaper to build the dam with steeper banks, pond owners are left with a short-lived pond with a weak and narrow dam.


"A dam with a broader base and gentler slopes will be stronger, less prone to erosion, less vulnerable to burrowing damage and easier to mow twice yearly to eliminate damaging trees and shrubs before they get established," Beem said.


Before dam construction, remove topsoil and dig a core trench along the midline of the dam.


"A trench needs to be dug along the midline and packed with your best clay soil before the dam is built. Skip this step and you risk water seeping under the dam," he said. "The soils in the dam can be properly compacted by laying it down in layers, checking for adequate moisture and using special compaction equipment on each layer, like a sheepsfoot roller."


Only soils with adequate water-holding capacity should be used. Also, there needs to be enough watershed to fill the pond.


"It takes a large runoff area to supply water to a pond, especially during a drought period," Beem said.


The Natural Resource Conservation Service (NRCS) offers expert, onsite advice for design and construction assistance.


"By all means pick an experienced earthwork contractor," said Beem. "But in addition, use the design assistance of the NRCS, and be onsite as often as possible to ensure NRCS recommendations are followed."


   

 

WebReadyTM Powered by WireReady® NSI

 


Top Agricultural News

  • Oklahoma Youth Expo Sale of Champions Sale Order Available Here- Sale Set for 4 PM Friday  Fri, 17 Mar 2023 04:50:54 CDT
  • Rural Voters Dominated Vote to Defeat Recreational Marijuana March 7th  Fri, 10 Mar 2023 07:13:05 CST
  • Ron Hays Talks to Israeli Ag Tour Guide Colin Lotzof About the Miraclel of Ag in Israel  Wed, 22 Feb 2023 22:11:04 CST
  • OALP Members Experience First Hand View of Cutting Edge Drip Irrigation Technology as Israel Travel Ends  Wed, 22 Feb 2023 10:51:49 CST
  • OALP Members Get First Hand View of Cutting Edge Drip Irrigation Technology as Israel Travel Ends  Wed, 22 Feb 2023 10:50:10 CST
  • Oklahoma Ag Leadership Program Sees Fruit, Beef and Dairy Production North of the Sea of Galilee in Israel  Mon, 20 Feb 2023 21:56:02 CST
  • Oklahoma Ag Leadership Program Sees Diverse Farm Operations in Jordan River Valley of Israel  Sun, 19 Feb 2023 21:17:30 CST
  • Israeli Tour Guide Mark Kedem Talks About The Cultural Aspects of What Class XX of OALP is Experiencing   Sat, 18 Feb 2023 22:17:23 CST

  • More Headlines...

       

    Ron salutes our daily email sponsors!

    Oklahoma Beef council Oklahoma Ag Credit Oklahoma Farm Bureau National Livestock Credit Ag Mediation Program P&K Equipment Oklahoma City Farm Show Union Mutual Stillwater Milling Oklahoma Cattlemen's Association KIS FUTURES, INC.
       
          
       
       

    Search OklahomaFarmReport.com

    © 2008-2024 Oklahoma Farm Report
    Email Ron   |   Newsletter Signup   |    Current Spots   |    Program Links

    WebReady powered by WireReady® Inc.